goingcritical:barakah-2United Arab Emirates · Power reactor

Barakah-2

Status: Operating critical since August 27, 2021 Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. Operating In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.

Site: Barakah, Al Dhafra Region, Abu Dhabi

United Arab EmiratesSharjahAd DammanMedinaShirazJeddahKuwait CityRiyadh
Barakah, Al Dhafra Region, Abu Dhabi23.9678° N, 52.2317° E
Summary:

Second unit of the Arab world's first nuclear power station

Details

DesignAPR-1400 (Generation III PWR)
Electrical output1,337 MWe

Milestone history

  1. Announced
  2. Construction start April 15, 2013
  3. Fuel load
  4. First criticality August 27, 2021
  5. Grid connection September 14, 2021
  6. Commercial operation March 24, 2022