goingcritical:bohunice-a1Slovakia · Power reactor

Bohunice A1

Status: Shut down reached first criticality October 24, 1972 Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. Operating In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.

Site: Jaslovské Bohunice, Trnava Region

PolandRomaniaBelarusLondonParisDuisburgKatowiceMannheimTurinDnipro
Jaslovské Bohunice, Trnava Region48.4944° N, 17.6806° E
Summary:

First nuclear power reactor in Czechoslovakia; Czechoslovak-designed gas-cooled heavy-water reactor, permanently shut down 22 February 1977 after a refuelling accident

Details

DesignHWGCR (KS-150)
Electrical output93 MWe

Milestone history

  1. Announced
  2. Construction start August 1, 1958
  3. Fuel load
  4. First criticality October 24, 1972
  5. Grid connection December 25, 1972
  6. Commercial operation December 25, 1972