Darlington New Nuclear Project Unit 4 (BWRX-300)

Status: Site preparation Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. Operating In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.

Site: Darlington New Nuclear Project site, Clarington, Ontario

New YorkChicagoTorontoProvidenceColumbusKansas CityBaltimore
Darlington New Nuclear Project site, Clarington, Ontario43.8728° N, 78.7197° W
Summary:

Fourth of four planned BWRX-300 units at the Darlington New Nuclear Project

OPG projects in-service dates of 2034-2036 for units 2-4, pending CNSC licensing; site grading for the three additional units is complete but construction has not started

Details

DesignGE Vernova Hitachi BWRX-300
Electrical output300 MWe

Milestone history

  1. Announced
  2. Construction start
  3. Fuel load
  4. First criticality
  5. Grid connection
  6. Commercial operation