Fukushima Daiichi 6

Status: Shut down reached first criticality March 9, 1979 Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. Operating In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.

Site: Okuma, Fukushima

North KoreaOsakaTokyoSeoulChangwonDaejeonFukuokaSendai
Okuma, Fukushima37.4214° N, 141.0325° E
Summary:

Largest and newest Fukushima Daiichi unit; its air-cooled backup diesel generator survived the March 2011 tsunami and powered cooling for both units 5 and 6, sparing them from meltdown. Permanently shut down 2013-12-17.

Details

DesignGE BWR-5 (Mark II containment)
Electrical output1,067 MWe

Milestone history

  1. Announced
  2. Construction start October 26, 1973
  3. Fuel load
  4. First criticality March 9, 1979
  5. Grid connection May 4, 1979
  6. Commercial operation October 24, 1979