goingcritical:gariglianoItaly · Power reactor

Garigliano

Status: Shut down reached first criticality June 5, 1963 Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. Operating In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.

Site: Sessa Aurunca, Campania

HungaryAlbaniaMontenegroIstanbulTurinIzmirFlorenceMarseilleTunisBelgrade
Sessa Aurunca, Campania41.2583° N, 13.8347° E
Summary:

An early General Electric dual-cycle boiling water reactor on the Garigliano river near Sessa Aurunca. Reached first criticality on 5 June 1963. Operations ceased in 1978 due to steam generator problems and it was formally shut down permanently on 1 March 1982; now under SOGIN decommissioning.

Details

DesignGeneral Electric BWR (dual-cycle)
Electrical output150 MWe

Milestone history

  1. Announced
  2. Construction start November 1, 1959
  3. Fuel load
  4. First criticality June 5, 1963
  5. Grid connection January 1, 1964
  6. Commercial operation June 1, 1964