goingcritical:krskoSlovenia · Power reactor

Krško

Status: Operating critical since September 11, 1981 Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. Operating In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.

Site: Krško, southeastern Slovenia

UkraineRomaniaAustriaIstanbulLondonParisDuisburgKatowiceMannheimTurin
Krško, southeastern Slovenia45.9384° N, 15.5155° E
Summary:

Slovenia's only nuclear reactor; jointly owned by Slovenia and Croatia, built in the former Yugoslavia

Details

DesignWestinghouse 2-loop PWR
Electrical output696 MWe

Milestone history

  1. Announced
  2. Construction start March 30, 1975
  3. Fuel load
  4. First criticality September 11, 1981
  5. Grid connection October 2, 1981
  6. Commercial operation January 1, 1983