goingcritical:laguna-verde-1Mexico · Power reactor

Laguna Verde-1

Status: Operating critical since November 8, 1988 Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. Operating In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.

Site: Laguna Verde, Alto Lucero, Veracruz

BelizeMexico CityTorreonLeonGuatemalaSan Pedro SulaCuliacanSan Luis Potosi
Laguna Verde, Alto Lucero, Veracruz19.7208° N, 96.4063° W
Summary:

Mexico's first nuclear power reactor

Details

DesignGeneral Electric BWR-5
Electrical output777 MWe

Milestone history

  1. Announced
  2. Construction start September 27, 1976
  3. Fuel load
  4. First criticality November 8, 1988
  5. Grid connection April 9, 1989
  6. Commercial operation July 29, 1990