Metsamor 2 (Armenian 2)

Status: Operating critical since January 1980 Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. Operating In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.

Site: Metsamor, Armavir Province

TurkmenistanIstanbulTehranGaziantepHimsMosulTabrizTbilisi
Metsamor, Armavir Province40.1820° N, 44.1470° E
Summary:

Armenia's sole operating reactor; shut down in 1989 after the 1988 Spitak earthquake and restarted 5 November 1995. Life extended to 2036. First criticality recorded as early January 1980 by WNA/PRIS.

Details

DesignVVER-440/270
Electrical output376 MWe

Milestone history

  1. Announced
  2. Construction start July 1, 1975
  3. Fuel load
  4. First criticality January 1980
  5. Grid connection January 5, 1980
  6. Commercial operation May 3, 1980