Groves Isotope Test Reactor

Status: Critical since August 5, 2026 Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. Operating In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.

Site: Lockhart, Texas

BirminghamCiudad JuarezFt. WorthAustinTorreonSan AntonioMemphis
Lockhart, Texas29.8850° N, 97.6700° W
Summary:

First advanced reactor project on private land with fully commercially sourced fuel and systems to receive DOE DSA approval; the test platform preceding Atomic Alchemy's planned ~15 MWt VIPR production units, not one of them (Oklo acquired Atomic Alchemy in 2025)

Details

DesignZero-power critical assembly / low-power isotope test reactor — water-cooled, non-pressurized, LEU uranium-dioxide (Framatome GAIA) fuel, five assemblies, maximum authorized power 100 W
CapacityUndisclosed

Milestone history

  1. Announced August 12, 2025
  2. Construction start 2025
  3. Fuel load
  4. First criticality August 5, 2026