Onagawa 1

Status: Shut down reached first criticality October 18, 1983 Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. Operating In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.

Site: Onagawa, Miyagi

North KoreaOsakaTokyoSeoulChangwonJilinDaejeonFukuoka
Onagawa, Miyagi38.4011° N, 141.4997° E
Summary:

First Onagawa unit; permanently shut down on 2018-12-21, with Tohoku opting to decommission rather than retrofit.

Details

DesignBWR-4
Electrical output498 MWe

Milestone history

  1. Announced
  2. Construction start July 8, 1980
  3. Fuel load
  4. First criticality October 18, 1983
  5. Grid connection November 18, 1983
  6. Commercial operation June 1, 1984