goingcritical:pickering-5Canada · Power reactor

Pickering 5

Status: Operating critical since October 23, 1982 Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. Operating In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.

Site: Pickering, Ontario

New YorkChicagoTorontoProvidenceColumbusKansas CityBaltimore
Pickering, Ontario43.8117° N, 79.0658° W
Summary:

First of the four Pickering B units; slated for refurbishment under OPG's Pickering B life-extension program

Details

DesignCANDU 500B
Electrical output516 MWe

Milestone history

  1. Announced
  2. Construction start November 1, 1974
  3. Fuel load
  4. First criticality October 23, 1982
  5. Grid connection December 19, 1982
  6. Commercial operation May 10, 1983