goingcritical:radiant-kaleidosUnited States · Microreactor
Radiant Kaleidos
Status: Under construction target criticality Q3 2026 (confidence: low) Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.
Site: DOME test bed (NRIC), Idaho National Laboratory, Idaho
First full-power test authorization (DARK approval, Feb 2026) under the Reactor Pilot Program; took possession of INL's DOME facility April 1, 2026; also selected for the Nuclear Energy Launch Pad
Company-stated target was all five phases of the fueled DOME campaign — zero-power criticality up to 150+ hours at full power — complete by Q3 2026. That window closed on 30 September 2026 with no reported criticality and no revised target from Radiant; the unit left El Segundo by road on 12 August 2026 and its arrival and emplacement at DOME have not been publicly confirmed. First TRISO fuel tranche was delivered to the DOME facility on 1 July 2026, six weeks before the reactor shipped.
Details
| Design | Kaleidos — helium-cooled, HALEU TRISO-fueled portable microreactor (1 MWe) |
| Capacity | 1 MW (thermal where reported) |
Milestone history
- Announced August 12, 2025
- Construction start —
- Fuel load —
- First criticality target Q3 2026
References
- World Nuclear News, TRISO fuel delivered for Kaleidos reactor experiment (July 1, 2026)
- ANS Nuclear Newswire, Reactor Pilot Program deadline check-in (July 2, 2026)
- Partnership for Global Security, RPP status (PDSA approved Feb 2026)
- DOE, initial Reactor Pilot Program selections (Aug 12, 2025)
- WNN (18 Aug 2026) — Kaleidos begins journey to Idaho; five-phase campaign targeted for completion in Q3 2026
- ANS Nuclear Newswire (2 Oct 2026) — Deployable Energy next in line for DOME; Radiant still described as testing first, no criticality reported