goingcritical:sanao-1China · Power reactor

San'ao-1

Status: Operating critical since February 14, 2026 Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. Operating In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.

Site: Wenzhou, Zhejiang

ShanghaiShenzhenWuhanTaipeiHechiXiangtanShangrao
Wenzhou, Zhejiang27.2014° N, 120.5157° E
Summary:

First of six planned Hualong One units at San'ao and the first Hualong One in operation in the Yangtze River Delta

Details

DesignHPR-1000 (Hualong One)
Electrical output1,117 MWe

Milestone history

  1. Announced
  2. Construction start December 31, 2020
  3. Fuel load December 24, 2025
  4. First criticality February 14, 2026
  5. Grid connection March 12, 2026
  6. Commercial operation April 29, 2026