goingcritical:shidaowan-2China · Power reactor

Shidaowan Guohe One 2

Status: Under construction Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. Operating In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.

Site: Shidao Bay (Rongcheng, Weihai), Shandong

North KoreaOsakaBeijingShanghaiSeoulChangwonZhuchengBaoding
Shidao Bay (Rongcheng, Weihai), Shandong36.9600° N, 122.5000° E
Summary:

Second CAP1400 (Guohe One) demonstration unit. Not listed in IAEA PRIS; PRIS's "SHIDAOWAN-2" is a separate Huaneng HPR1000 unit (construction start 2025) at the same site. WNA notes construction start date is from satellite data and official first concrete may be up to 12 months earlier.

March 2022 announcement targeted commercial operation of both CAP1400 units in 2025; that target has passed and no updated official criticality target was found as of July 2026

Details

DesignCAP1400
Electrical output1,400 MWe

Milestone history

  1. Announced
  2. Construction start April 21, 2020
  3. Fuel load
  4. First criticality
  5. Grid connection
  6. Commercial operation