goingcritical:trilloSpain · Power reactor
Trillo-1
Status: Operating critical since May 14, 1988 Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.
Site: Trillo, Guadalajara
Spain's only German-designed reactor, a Siemens/KWU 3-loop PWR on the Tagus river in Guadalajara. Trillo-1 was the last Spanish nuclear plant to enter service, going critical in May 1988. It is operated by CNAT with Iberdrola as the largest owner.
Details
| Design | Siemens/KWU 3-loop PWR |
| Electrical output | 1,003 MWe |
Milestone history
- Announced —
- Construction start August 17, 1979
- Fuel load —
- First criticality May 14, 1988
- Grid connection May 23, 1988
- Commercial operation August 6, 1988