goingcritical:yankee-roweUnited States · Power reactor

Yankee Rowe

Status: Shut down reached first criticality August 19, 1960 Reactor status full glossary → Announced Publicly announced — a site and design are proposed, but construction has not begun. Site preparation Early site and civil works are under way; the first safety-related ("nuclear") concrete has not yet been poured. Under construction Formal construction has begun, marked by the first nuclear concrete. Fuel loaded Nuclear fuel has been loaded into the core. The reactor is fuelled but has not yet gone critical. Critical Has reached first criticality — a self-sustaining chain reaction, usually at low power — but is not yet connected to the grid. Grid connected Synchronised to the electrical grid and exporting power for the first time, but still in commissioning and power-ascension testing — not yet in commercial service. Operating In commercial operation — the operator has formally declared the unit in regular commercial service. Shut down Permanently shut down and no longer generating; may be defuelled, undergoing decommissioning, or preserved in place. Canceled Abandoned before completion.

Site: Rowe, Massachusetts

New YorkChicagoTorontoProvidenceVirginia BeachColumbusBaltimore
Rowe, Massachusetts42.7278° N, 72.9291° W
Summary:

One of the first commercial nuclear power plants in the United States; operated about 30 years before closing in 1991

Details

DesignWestinghouse PWR
Electrical output167 MWe

Milestone history

  1. Announced
  2. Construction start November 1, 1957
  3. Fuel load
  4. First criticality August 19, 1960
  5. Grid connection November 10, 1960
  6. Commercial operation July 1, 1961